Altadena / Unincorporated LA County
When Altadena is ready for the deck, we'll build it to today's code.
The Eaton Fire started in Altadena on January 7, 2025, and destroyed 9,419 structures. A deck is a small part of putting a home back together, and it usually comes late. When you reach it, we can rebuild it with the county's current rules and its fire guidance built in.
The county is your building department
Altadena is not a city. It is unincorporated Los Angeles County, so permits for a rebuilt deck go through the county, not through Pasadena next door. For fire recovery the county runs an Altadena One-Stop Permit Center at 464 W Woodbury Road, Suite 210. When a job needs a permit, we prepare the drawings and handle the submission there.
Like-for-like, with room to adjust
The county's like-for-like path lets a rebuild grow by up to 10% or 200 square feet, whichever is greater. Like-for-like projects are exempt from current zoning, but not from current building and fire codes. For a deck, that usually means the old footprint can come back, while the boards, framing, connections and railings are built to the code in force now.
If you have photos of the old deck, keep them. They help show what was there, and they help us talk through what you want to keep and what you would change.
What the county asks of a rebuilt deck
LA County's resilient-rebuilding guidance speaks to decks directly. It recommends enclosing the area under a deck with mesh no larger than 1/8 inch, keeping anything combustible out from under it, and separating decks and fences from the house with a noncombustible barrier.
We build those details in from the first drawing rather than adding them later. On the walking surface, we install decking listed by the California State Fire Marshal for fire hazard severity zones. No deck is immune to fire. These details are about cutting down the places where embers can collect. More on materials on our fire-zone decks page.
Local sources: CAL FIRE: Eaton Fire · LA County One-Stop Permit Centers · LA County like-for-like rebuild · LA County resilient rebuilding guidance
Altadena
Questions from Altadena homeowners
Who issues deck permits in Altadena?
Los Angeles County, because Altadena is unincorporated. For fire recovery, the county runs the Altadena One-Stop Permit Center at 464 W Woodbury Road, Suite 210.
Can my Altadena deck come back bigger than before?
Under the county's like-for-like path, a rebuild may grow by up to 10% or 200 square feet, whichever is greater. It is exempt from current zoning, but it still has to meet current building and fire codes.
What does the county recommend under a rebuilt deck?
Its resilient-rebuilding guidance recommends enclosing the space under the deck with mesh no larger than 1/8 inch and keeping combustible materials out from underneath. It also recommends a noncombustible separation between the deck and the house.