Raised wood deck with cable railing behind a ranch house, the Verdugo Mountains and tall palms behind

Burbank / Verdugo foothills

In the Burbank hills, the permit comes before the permit.

On a hillside lot in Burbank, some decks need a Hillside Development Permit before the city will even look at building plans. We find out which side of that line your deck sits on before you settle on a size.

What sends a deck to hillside review

Burbank asks for a Hillside Development Permit before grading or building permits are issued when a hillside project does any of these: any grading at all, including grading to make a bigger yard; a structure that reaches beyond the front or rear setback; a roof over 16 feet; or more than 3,000 square feet.

The first two are the ones that catch decks. A deck that steps out past the rear setback over the slope, or a level pad scraped out for footings, can put a small job into a separate review. We look at both before drawing, because sometimes a change in shape keeps the deck out of review, and when it cannot, you should know that at the start.

A real case: the Olney Place deck

The city's 2022 decision on 2931 Olney Place shows how this plays out. The application was for a 572 square foot rear deck on a slope of about 30 degrees, sitting 5 to 10 feet above the ground. It was approved with a glass railing and screening on the side facing the neighbours below, and the deck was counted in the lot coverage.

It was not our project, but it is a useful preview: on a Burbank hillside the city is looking at what your neighbours see and at how much of the lot is built on, not only at the framing. A hillside deck design here should answer those questions up front, and railing choice can be part of the answer.

Fire season and the June 1 deadline

Cal Fire's 2025 recommended maps put 3,565 acres of Burbank in the Very High fire zone. On a lot in a fire hazard severity zone, the deck surface has to meet California's Wildland-Urban Interface Code; we install decking listed by the California State Fire Marshal for those zones.

The Burbank Fire Department sets June 1 as the brush clearance deadline. If your build lands in spring, it helps to have the slope cleared before the crew arrives, so the footings go in on open ground. The board options for those zones are on ourfire-zone decks page.

Local sources: 2931 Olney Place decision letter (City of Burbank) · Burbank Fire hazard reduction FAQs · OSFM 2025 recommended LRA acreage, LA County

Burbank

Questions from Burbank homeowners

Does my Burbank deck need a Hillside Development Permit?

On a hillside lot, it does if the project includes any grading, reaches beyond the front or rear setback, has a roof over 16 feet or tops 3,000 square feet. Most decks only risk the first two. We check your lot and the design against those triggers before anything goes to the city.

Will Burbank count my deck in lot coverage?

On the 2022 Olney Place hillside decision, the city did count the new rear deck in the lot coverage. If your lot is close to its limit, the deck's size may be set by that number, so we work it out early.

When is brush clearance due in Burbank?

June 1, according to the Burbank Fire Department. If your deck build overlaps with that, plan the clearing first so the crew has room to dig footings.

Free on-site estimate

Let's look at your yard in Burbank.

Tell us a little about the project and we'll set up a free on-site estimate. We reply within one business day.

Rather talk now? (818) 245-5541

Photos optional
Up to 6. A wide shot and a close-up of anything worn or broken let us take a look before the visit.

We use your details only to reply about your project. See our privacy policy.

Before you go

Still picturing the deck? Let's look at it together.

Leave a name and number and we'll call to set up a free on-site estimate. We'll look at the yard, the slope and the sun with you. No obligation.

Rather call now? (818) 245-5541 What a deck costs in LA

We reply within one business day. See our privacy policy.