
Deck replacement / Tear-out to final board
Done patching the old deck? Start over from the footings.
We take the old deck down to the ground, keep only what is sound and rebuild the rest. Our own crew, permits handled, the owner on site for every build.
Signs the deck is past saving
Most people call us after something gives: a board that sags under a chair leg, a soft spot by the door, a deck that bounces when the kids run across it. Others find out from a home inspection report that flags rot at the ledger or a railing that moves.
A few signs nearly always mean replacement rather than repair:
- Rot in the joists or beams, not only the boards. Push a screwdriver into the wood under the deck. If it sinks in, the frame is going.
- Termite damage through the framing. If the termites are still active, have a pest-control company treat them before we rebuild.
- A gap opening between the deck and the house. That is the ledger pulling away, and it is the one that worries us most.
If a board has already given way, or the deck is pulling away from the wall, stay off it and call us.
Tear-out comes first
We remove the boards, railings and stairs, and take the frame down as far as it needs to go.
With the boards off, we can see the frame for what it is. That is when we can confirm what stays and what goes.
Footings and frame, checked one by one
Old decks were often built with joists too far apart, posts sitting on a block of concrete or bare soil, and no flashing where the ledger meets the house. We check every footing, post, beam and joist, and the ledger board and its connection to the wall.
Whatever is sound and built to today's spacing can stay. Whatever is not gets replaced: new footings where the old ones are undersized or cracked, new joists at the spacing the new boards need, and a ledger that is properly bolted and flashed so water runs off it instead of into the house.
When we find rot you could not see
Sometimes the damage only shows once the boards come up: a ledger that looked fine from below, or rot inside a post. When that happens we stop, show you what we found, and give you a written change order with the price before we go any further. Nothing extra starts until you have signed it, which is also what California law requires.
Then the new deck
Once the frame is right, the new boards, fascia, stairs and railing go on. Most replacements we build are composite, so you are done with sanding and staining. On a sloped lot, the rebuild often looks a lot like a hillside deck from the footings up.



Questions
What people ask us
Can you reuse my old deck frame?
Only the parts that are sound and built to today's spacing. We check each footing, post, beam and joist once the boards are off, and show you what can stay and what has to go before anything is replaced.
What happens if you find more rot during demolition?
We stop, show you what we found and give you the price to fix it in writing. Work on that part only goes ahead once you have agreed to it.
My home inspection report flagged the deck. Can you help?
Yes. Send us the page of the report that covers the deck, along with a few photos, and we will tell you at the estimate whether it needs a repair or a full replacement and why.
Is it safe to use the old deck until you start?
Keep off any board that feels soft or flexes, and off the whole deck if it has started to pull away from the house or a railing moves when you lean on it. Tell us about it when you call and we will look at that first at the estimate.
Free on-site estimate
Let's look at your yard.
Tell us a little about the project and we'll set up a free on-site estimate. We reply within one business day.
Rather talk now? (818) 245-5541

