Long deck running along a brushy hillside, its boards curving with the slope

Hillside and elevated decks / Built from the footings up

Turn the slope into the best seat on the hill.

On a sloped lot the deck is mostly frame: footings, posts, beams and bracing that hold it level over the hill. We build that part first and build it properly.

Where the money goes on a hillside deck

On a flat backyard, most of the cost is in the boards and railing you can see. On a slope it flips. The frame carries the deck several feet, sometimes a full storey, above the ground, and it has to stay level and stiff while people stand at the rail looking out.

That frame is the part you will never see again once the boards go on, and the part that decides whether the deck feels solid in twenty years. It is where we spend the time.

Footings, posts and bracing

Each post sits on a concrete footing dug into the hillside. On a slope the footings are often deeper and set at different heights, and the soil and the steepness decide how big they need to be. Posts carry beams, beams carry joists, and diagonal bracing stops the whole frame from racking sideways.

Where the deck meets the house, the ledger is bolted to the wall and flashed so rainwater runs past it instead of into the framing behind it.

Engineering and plan check

A deck this high off the ground needs a building permit. On a hillside, the city may also ask for structural drawings from an engineer, and a steep or complicated site can go to a full plan check rather than a quick counter review. We pull the permit with whichever building department covers your address, whether that is LADBS, Calabasas, Malibu or another city.

Plenty of hillside lots in the Santa Monica Mountains and the canyons are also in a fire hazard severity zone, which sets rules for the decking itself. See fire-zone decks.

Getting the material up the hill

Steep driveways, narrow canyon roads, a backyard reached only by side steps: we plan the delivery and how the lumber, concrete and boards will reach the back of the house before the job starts, and we look at all of it at the estimate so access does not turn into a surprise halfway through.

On top of the frame

On a view lot we usually suggest composite boards with cable or glass railings, so the railing does not block the view you built the deck for. If the deck is coming off an upper floor rather than the hillside itself, see second-story decks.

Round caisson forms braced with timber on a dug-out slope
Caisson forms braced on a steep lot
Deck framing on tall posts under oak trees beside a hillside house
Framing the upper levels under the oaks
Aerial view of a long deck and its railing following a hillside
From above: the deck's edge and railing along the slope

Questions

What people ask us

Can you build a deck on a steep hillside?

Yes. Steep lots need deeper footings, taller posts and bracing, and often an engineer's drawings for the permit. We look at the slope, the soil and the access at the estimate and tell you what the site needs.

Why does a hillside deck cost more than a flat one?

Because most of the work is underneath it. Deeper footings, taller posts, bracing, engineering and moving material up a steep lot all add time and cost before a single board goes down.

Do I need an engineer for a hillside deck?

Often, yes. Many building departments ask for structural calculations or drawings for a raised deck on a slope. If yours does, the deck is built to the engineer's design and that is what the inspector checks against.

Our backyard is only reachable by stairs. Is that a problem?

No. It means more planning for how the material gets to the back, and sometimes more time on site. We work it out at the estimate so it is in the price from the start.

Free on-site estimate

Let's look at your yard.

Tell us a little about the project and we'll set up a free on-site estimate. We reply within one business day.

Rather talk now? (818) 245-5541

Photos optional
Up to 6. A wide shot and a close-up of anything worn or broken let us take a look before the visit.

We use your details only to reply about your project. See our privacy policy.

Before you go

Still picturing the deck? Let's look at it together.

Leave a name and number and we'll call to set up a free on-site estimate. We'll look at the yard, the slope and the sun with you. No obligation.

Rather call now? (818) 245-5541 What a deck costs in LA

We reply within one business day. See our privacy policy.