A raised deck off an upper floor turns a window into a room outside. The work that makes it safe is where it meets the house and what holds it up.
Where the deck meets the house
On a second-story deck, the ledger board does half the work: it is bolted to the house framing and carries one side of the deck. It is also where most raised decks fail, because water gets in behind it and rots the ledger and the wall.
We find solid framing in the wall, bolt the ledger through to it, and flash above and around it so rain runs out over the ledger instead of in behind it. That detail is invisible on the finished deck, and it matters more than any board you choose.
Posts, beams and footings
The outer side of the deck sits on a beam carried by posts, and each post needs its own concrete footing. The higher the deck, the larger the posts and the more bracing the frame needs to stay stiff. We size all of it for the height and span, and place the posts so they do not land in the middle of the patio or the path below.
Guardrails and the permit
Any deck more than 30 inches off the ground needs a guardrail, at least 36 inches high in most homes, with openings too small for a 4-inch ball to pass. On a raised deck we build to that, or higher where the building department asks for it. Cable or glass keeps the view open; see railings and stairs.
A second-story deck always needs a building permit. We pull it with the city that covers your address and build to the approved plans, through to final inspection.
Rooftop decks: what we build and what we do not
On a flat roof, the deck sits on top of the roof covering, not in place of it. The roof membrane or waterproofing under the deck is installed by a licensed roofer or waterproofing contractor. We do not do that work.
What we build is the deck that sits on it: the framing or supports, the walking surface and the railings, laid out so the deck does not puncture the membrane and water can still drain underneath. If your roof needs work first, get that done before we start, and we will build to suit what your roofer has installed.
Choosing the boards
Upstairs decks are seen from inside the house every day, so the boards matter. Composite suits a raised deck well because it never needs staining, which saves hauling a sander up a ladder every couple of years. On a sloped lot where the deck is high off the ground anyway, see hillside and elevated decks.



Questions
What people ask us
Can you add a deck to a second-floor bedroom?
Usually, yes. The house has to have solid framing where the ledger goes, and there has to be room below for posts and footings. We check both at the estimate.
How high does a deck railing have to be?
Under the California residential code, a deck more than 30 inches above the ground needs a guardrail at least 36 inches high, with openings that a 4-inch ball cannot pass through. Some cities ask for more (the City of Los Angeles deck bulletin calls for 42 inches), and we build to whatever applies at your address.
Do you waterproof rooftop decks?
No. The roof membrane or waterproofing under a rooftop deck has to be installed by a licensed roofer or waterproofing contractor. We build the deck, the surface and the railings that sit on top of their work.
Will a raised deck make the room below dark?
It can shade a window or patio below it. We look at what sits underneath at the estimate, and the layout of the posts and the size of the deck can be planned to keep that to a minimum.
Free on-site estimate