Malibu / Coast and canyon
In Malibu, the paperwork is drawn before the deck is.
Every Malibu deck goes through the city's Planning desk before Building Safety will look at it, and every lot in the city sits in the Very High fire zone. We plan the deck around both from the first visit.
No street in Malibu is outside the fire zone
On October 27, 2025 the City Council voted unanimously for Ordinance No. 527, which put the entire city in a Very High Fire Hazard Severity Zone on the 2025 state map. There is no lucky side of PCH any more. On a bluff, up a canyon or a block from the sand, the walking surface of a new deck has to meet California's wildland-urban interface code.
That rules out ordinary lumber with a coat of fire-retardant stain on it: coatings do not count. We install decking listed by the California State Fire Marshal for fire hazard severity zones, and a shade structure within 50 feet of the house has its own material rules too. See fire-zone decks and pergolas and patio covers.
The coastal step
Malibu has had a certified Local Coastal Program since 2002, which means the city itself reviews and issues coastal development permits rather than sending you to the state. Deck projects here commonly pass through that coastal review, either as a full coastal development permit or as an exemption the city signs off on. Which one your deck needs depends on the lot and the work, so it is one of the first questions we take to the city, not the last.
Planning signs off, then plan check starts
The city's own residential flowchart puts Planning approval ahead of Building Safety plan check, and applications go in through the Malibu Development Portal. For you, that means the design has to be settled early: changing the deck's size or position after Planning has approved it sends it back a step. So we measure, look at the slope and agree on the footprint with you before drawing details. Most Malibu calls are about a deck that needs replacing or a deck stepping down a slope.
Local sources: City of Malibu Building Safety · Malibu residential plan check flowchart · Malibu Local Coastal Program · Ordinance No. 527 (Santa Monica Daily Press) · Example Malibu deck CDP exemption (CEQAnet)
Malibu
Questions from Malibu homeowners
Will my Malibu deck need a coastal development permit?
Possibly. Malibu issues its own coastal development permits under its 2002 Local Coastal Program, and deck projects commonly go through either a permit or a city-approved exemption. Which applies depends on your lot and the scope, so we confirm it with the city before the design is final.
My house is near the beach. Do the fire-zone deck rules still apply?
Yes. Since Ordinance No. 527 in October 2025, the whole of Malibu is in a Very High Fire Hazard Severity Zone, beach streets included. The deck surface has to meet the wildland-urban interface code wherever you are in the city.
Why does Planning have to approve my deck before plan check?
That is the order the City of Malibu sets for residential projects: Planning review comes first, then Building Safety checks the construction drawings. It settles the coastal and zoning questions before the structural ones.