
Studio City / Next door to our office
Thinking of a roof deck in Studio City? Start with the side yard.
On a hillside lot zoned R1, the city wants an occupied roof deck set three feet further in than the side yard. It is one of a few Studio City rules worth knowing before you fall for a drawing.
The roof deck rule most people miss
The Baseline Hillside Ordinance, as amended in 2017, covers single-family lots that the city designates Hillside Area. In R1 zones it adds a detail that shapes every roof deck: an occupied roof deck has to be set back three feet beyond the minimum side yard. On a narrow lot, that can take a real bite out of the usable width, so we measure it before drawing the railing line. See our second-storey and rooftop decks page for how we build up there.
Grading limits on the hill
The same ordinance ties how much earth can be graded and moved to the size of the lot. And in the hillside grading area, a retaining wall that holds up a built-up platform counts toward the lot's allowed retaining walls. Between the two, a hillside deck is often better off on posts and footings than on a cut-and-filled pad. Check the "Hillside Area (Zoning Code)" line for your address in ZIMAS, and look at our hillside decks page.
On the fire department's list
LAFD names Studio City among the communities with portions in the city's Very High Fire Hazard Severity Zone. A deck there needs a walking surface that meets the California Wildland-Urban Interface Code; a fire-retardant stain painted on afterward does not qualify. We install decking listed by the California State Fire Marshal for fire hazard severity zones. Our fire-zone decks page has the rest.
The rest is ordinary LADBS
Lower down, a Studio City deck follows the city-wide rules. Under 30 inches above grade, with no basement or storey below it, there is no building permit, though setbacks apply. Higher than that, we pull the LADBS permit. Our office is in Sherman Oaks, the next neighbourhood west along Ventura Boulevard.
Local sources: LADBS Baseline Hillside Ordinance correction sheet · LADBS deck bulletin P/ZC 2023-004 · LAFD fire zone history · LAMC 91.106.2 (City Clerk)
Studio City
Questions from Studio City homeowners
How far from the property line does a Studio City roof deck have to be?
On an R1 lot under the Baseline Hillside Ordinance, an occupied roof deck must be set back three feet more than the minimum side yard. Other zones and non-hillside lots follow their own setbacks, so we check yours first.
Can a fire-retardant stain stand in for fire-zone decking in Studio City?
No. Under the state's wildland-urban interface code, coatings and stains do not count as the required protection. A new deck in the Very High zone needs a walking surface that qualifies on its own.
Does a deck retaining wall count against my hillside lot?
In the hillside grading area, yes. LADBS counts retaining walls that support a built-up platform toward the number the lot is allowed.
Free on-site estimate
Let's look at your yard in Studio City.
Tell us a little about the project and we'll set up a free on-site estimate. We reply within one business day.
Rather talk now? (818) 245-5541

