
Santa Monica / Ocean side
Twenty degrees cooler than Woodland Hills, with a coastal permit to plan for.
A Santa Monica deck gets used at midday in August, and in the coastal zone it can need a permit from the state as well as the city. This is what shapes a deck on this side of the 405.
The state still issues coastal permits here
Unlike Malibu, Santa Monica has no certified Local Coastal Program. So inside the city's coastal zone, coastal development permits come from the California Coastal Commission. AB 1740, signed in October 2026, sets out a path for the city to get its own plan certified, but until that happens the Commission is the one that decides.
The building permit is a separate step with the City's Building & Safety division. Decks are not on the city's Express Permit list, so expect a regular plan check rather than a same-day approval. We draw and submit for you, and at the estimate we flag whether your address sits in the coastal zone.
The north of the city, on the 2025 fire map
The city's March 2025 fire hazard map for its local responsibility area shows Very High, High and Moderate zones, and the hazard areas grew in the north of the city. If your lot falls in one, the walking surface of a new deck has to meet California's wildland-urban interface code. We install decking listed by the State Fire Marshal for fire hazard severity zones. More on our fire-zone decks page.
A deck you will use at three in the afternoon
The average August high in Santa Monica is about 76.5°F. In Woodland Hills it is about 97°F. That gap changes how a deck gets used: here it is a midday space, not just an evening one, so board colour, shade and where the sun lands deserve as much thought as the square footage. Look at composite and hardwood boards in your own light before choosing, and a pergola overhead is worth pricing at the same time.
Local sources: Santa Monica permit streamlining (Express Permits) · Coastal Commission staff report on Santa Monica · AB 1740 (Santa Monica Daily Press) · Santa Monica 2025 fire hazard map · LA Almanac temperature normals
Santa Monica
Questions from Santa Monica homeowners
Does Santa Monica issue its own coastal development permits?
Not yet. The city has no certified Local Coastal Program, so the California Coastal Commission handles coastal development permits in Santa Monica's coastal zone. AB 1740 (October 2026) sets a path toward local certification.
Can a deck go through Santa Monica's Express Permit program?
No. Decks are not on the city's Express Permit list, so a deck goes through Building & Safety's regular plan check.
Which part of Santa Monica is in a fire hazard zone?
The city's 2025 map shows Very High, High and Moderate zones, with the hazard areas growing in the north of the city. Check your address on the map linked below; if it is in a zone, the deck surface has to meet the wildland-urban interface code.
Free on-site estimate
Let's look at your yard in Santa Monica.
Tell us a little about the project and we'll set up a free on-site estimate. We reply within one business day.
Rather talk now? (818) 245-5541

